✓ Usually permitted development
Tile-hung
Clay or concrete tiles hung on the dormer cheeks and face to match the main roof. It is the finish councils most readily accept as similar in appearance.
Rear Dormer
Full-height loft rooms from £45,000, usually without planning permission
We lift the back slope of your roof into a straight wall and a flat roof, turning the loft from a space you stoop in into a room you live in. The front of the house looks exactly as it did.

Fixed price from
£45,000 excl. VAT
The rules cap how much new roof space you can add.
Set your house type and three measurements, and see how much of the allowance a full-width dormer would use.
Usually the width of the house, less the party wall
Top of ceiling joist to underside of ridge
Back wall to the ridge, measured on plan
Roof volume added
22.2 / 40m³
Allowance left
17.8m³
Full-height floor
18.5m²
Comfortably inside the permitted development allowance for this house type.
A guide based on a full-width box dormer. Volume is measured from the outside faces of the roof, so your designer's figure will differ slightly. How permitted development works
Volume is only one test. A dormer has to pass all seven conditions to count as permitted development.
In a conservation area?
Dormer permitted development rights do not apply there, so a planning application is needed. We prepare and submit it, and a well-designed rear dormer is often approved.
40m³ for a terraced house, 50m³ for semi-detached and detached. Any earlier roof extension counts towards the same total.
The dormer cannot sit on a roof slope that faces the road at the front of the house.
No part of the dormer can be higher than the highest part of the existing roof.
The face of the dormer must be set back at least 20cm from the eaves, measured up the roof slope.
Materials must be similar in appearance to the existing house, which is why tile-hung cheeks are so common.
Verandas, balconies and raised platforms are excluded. Juliet balconies with no platform are generally fine.
Any side-facing window must be obscure-glazed and fixed shut, unless the opening part is more than 1.7m above the floor.
Passing all seven means no planning application, but we still recommend a Lawful Development Certificate — the council's written confirmation that buyers' solicitors will ask for when you sell.
The dormer gives you full height at the back, while the front keeps its slope. Good layouts put the rooms you stand in under the dormer and use the slope for beds, desks and storage.
Illustrative plan of a typical 5.2m-wide terrace loft. Your layout is drawn to your measurements.
The layout most people ask for
One generous bedroom running the full width, with the shower room tucked into a corner of the dormer where the ceiling is at full height. The bed sits against the party wall, facing the dormer window.
The outside finish affects more than looks. It can decide whether your dormer counts as permitted development or needs a planning application.
✓ Usually permitted development
Clay or concrete tiles hung on the dormer cheeks and face to match the main roof. It is the finish councils most readily accept as similar in appearance.
✓ Usually permitted development
Natural or fibre-cement slate on the cheeks, for houses with a slate roof. Common on Victorian terraces across south and west London.
! Often needs planning
A crisp contemporary look with standing-seam zinc or vertical timber. Many councils do not treat it as similar to a tiled roof, so we normally take it through a planning application.
The dormer itself is similar from house to house. What moves the price is the width of the house, the length of the steels and what goes inside the room.
Towards £45,000
Towards £70,000
Every quote is fixed and itemised. Steels, the dormer, insulation, stair, fire doors, plastering, electrics, building control and a 10-year structural warranty are all included. VAT and party wall surveyor fees are extra.
Open the cost estimatorThe key moment in a dormer build is the week the roof opens. Everything before it is preparation, so that week goes quickly and stays dry.
Week 1
Scaffold and protection
Scaffolding goes up at the rear with a loading platform at roof level. The loft is cleared and sheeting is ready for the day the roof opens.
Week 2
Steel beams in
Steels are lifted up the scaffold and through the roof, then set onto padstones in the party walls. They carry the new floor and the dormer above.
Weeks 3–4
The roof opens
The rear slope is stripped in sections and the dormer is framed in timber. It is sheeted every evening until the flat roof deck is on.
Weeks 4–5
Weathertight
The flat roof membrane goes down, windows are fitted, and the cheeks are tile-hung or clad. From here on, work moves inside.
Weeks 5–7
Insulation and first fix
Walls and roof are insulated, partitions go up, and pipes for the en-suite and cables are run. Building control inspect before anything is boarded.
Week 8
Staircase
The landing ceiling is opened and the new stair fitted, with fire doors to the rooms below. Expect two or three days of dust on the landing.
Weeks 9–11
Plaster, tiling, second fix
Boarding and skim, then the en-suite is tiled and fitted, sockets and lights go on, and floors and joinery are finished.
Week 12
Sign-off and handover
Final building control inspection, snagging, scaffold down and a full clean. You get your completion certificate and warranty documents.
What Our Customers Say
Real reviews from verified Google customers
125 Google reviews
“A first-class experience from start to finish! Christian arrived promptly and provided a highly detailed, comprehensive quote. The team stuck to the timeline strictly, finishing exactly on time — often staying into the early evening to push the project forward. Finding an honest and professional builder is never easy, but LINX truly excelled in every department.”
“The quality of workmanship was outstanding, attention to detail was second to none, and everything was completed to a very high standard. The team was respectful, punctual, and kept the work area clean and organised throughout. A truly stress free experience from start to finish.”
“We recently completed a wraparound extension and couldn't be happier with the results. A special thank you to Ryan and Gary who went above and beyond throughout the entire project. The quality of workmanship is outstanding — the transformation of our home has exceeded all expectations. We've had so many compliments already!”
“A first-class experience from start to finish! Christian arrived promptly and provided a highly detailed, comprehensive quote. The team stuck to the timeline strictly, finishing exactly on time — often staying into the early evening to push the project forward. Finding an honest and professional builder is never easy, but LINX truly excelled in every department.”
“The quality of workmanship was outstanding, attention to detail was second to none, and everything was completed to a very high standard. The team was respectful, punctual, and kept the work area clean and organised throughout. A truly stress free experience from start to finish.”
“We recently completed a wraparound extension and couldn't be happier with the results. A special thank you to Ryan and Gary who went above and beyond throughout the entire project. The quality of workmanship is outstanding — the transformation of our home has exceeded all expectations. We've had so many compliments already!”
“From the initial consultation through to completion, the team was professional, dependable, and easy to work with. The standard of work was exceptional, with careful attention to detail and a clear focus on quality. The project was completed on schedule and the finished result exceeded my expectations.”
“LINX completed a full flat renovation for me in Forest Hill. I originally chose them because they offered the best quote, but what really stood out was the daily communication, flexibility, and quality of their work. I highly recommend this company.”
“The team was professional, easy to communicate with, and delivered high-quality work. The finish looks clean and modern, and they paid great attention to detail throughout. I'd definitely recommend them.”
“From the initial consultation through to completion, the team was professional, dependable, and easy to work with. The standard of work was exceptional, with careful attention to detail and a clear focus on quality. The project was completed on schedule and the finished result exceeded my expectations.”
“LINX completed a full flat renovation for me in Forest Hill. I originally chose them because they offered the best quote, but what really stood out was the daily communication, flexibility, and quality of their work. I highly recommend this company.”
“The team was professional, easy to communicate with, and delivered high-quality work. The finish looks clean and modern, and they paid great attention to detail throughout. I'd definitely recommend them.”
A dormer pulls the back slope of your roof up to a vertical wall, so almost the whole rear half of the loft gets full standing height. On a typical London terrace, that is enough for a double bedroom with an en-suite, or two smaller rooms. The calculator on this page shows the full-height floor area for your dimensions.
Usually not, as long as the dormer stays within the permitted development rules: inside your volume allowance, on the rear slope, below the ridge and finished in similar materials. You do need planning if you are in a conservation area, live in a flat or maisonette, have an Article 4 direction, or want a dormer larger than the allowance. We confirm which applies before design starts.
Under permitted development there is no planning consultation, so neighbours are not asked to comment. If the steel beams or new joists sit into a shared wall, though, you must serve notice under the Party Wall etc. Act 1996. Most neighbours agree in writing. We supply the drawings that the notice needs.
Not under permitted development, which rules out balconies, verandas and raised platforms. A Juliet balcony, meaning French doors with a glass or metal guard and no platform to step onto, is generally accepted. A full balcony needs a planning application, and we can prepare one.
The rear slope is only stripped once the steels are in and the dormer frame is ready to go up. Openings are covered with heavy-duty sheeting at the end of every day, and the new flat roof is usually on within a week or two. Your ceilings below stay in place throughout, which adds another layer of protection.
On most terraces it does, because every centimetre of width adds usable floor. Building up to the line of the party wall needs a party wall agreement and careful fire-stopping between the two lofts. Where a neighbour has already built a dormer, we can often line up with theirs for a tidier look from the garden.
We use a single-ply membrane or a GRP fibreglass roof, laid over insulation on a timber deck. Both are seamless, take foot traffic for maintenance, and cope well with the movement of a timber structure. Where the roof is visible from a window above, we can finish it with a lighter colour or a sedum layer.
Get Started Today
Use our free property checker or speak directly with our team. We respond to all enquiries within one working day.